Test
...
The scope of work shall include the following works :
a. Review, comments, finalization and stamping of earthing schematics, earthing layout, earthing calculations and lightning protection layout drawings of the following buildings of NPP 0032 :
i. GCT office building (bldg.. no. 2.1)
ii. GCT Transit shed-1 (bldg.. no. 2.2.1)
iii. GCT Transit shed-2 (bldg.. no. 2.2.2)
iv. GCT Equipment maintenance workshop (bldg. no. 2.3)
v GCT Refrigerated storage building (bldg. no. 2.5)
vi. GCT Entry/Exit gate complex (bldg. no. 2.10)
vii. MUT office building (bldg.. no. 3.2)
viii. MUT Food office building (bldg.. no. 3.9)
ix. MUT Entry/Exit gate complex (bldg. no. 3.10)
x. OST office building (bldg.. no. 5.1)
xi. OST Equipment maintenance workshop (bldg. no. 5.4)
xii. OST Entry/Exit gate complex (bldg. no. 5.10)
b. Lightning protection risk assessment calculation and Lightning protection system design calculation as per IEC 62305-2,3.
c. Represent AFCONS for design review meetings/workshop meetings with NPP/PMC/EDC if required.