SCope of work includes preparation of following drawings and calculations :
| SL. NO. | DESCRIPTION |
| A. | ELECTRICAL DRAWINGS : |
| 1 | SLD |
| 2 | ELECTRICAL LAYOUT & ELEVATION, EKD |
| 3 | CABLE ROUTING, TRAY & TRENCH LAYOUT AND DETAILS |
| 4 | EARTHING LAYOUT & DETAILS |
| 5 | LIGHTNING PROTECTION LAYOUT & DETAILS |
| 5.1 | DSLP layout and BOM of 132/33kV Tr-3 bay extension |
| 6 | CABLE SCHEDULE & INTERCONNECTION DIAGRAMS |
| B | ELECTRICAL DESIGN CALCULATIONS |
| C | STRUCTURAL DRAWINGS WITH BOM AND WEIGHT AND DESIGN CALCULATIONS : |
| C.1 | 132KV GANTRY AND EQUIPMENT SUPPORT |
| C.2 | 33KV GANTRY AND EQUIPMENT SUPPORT |
| C.3 | STRUCTURAL DESIGN CALCULATIONS : |
| D | CIVIL CONSTRUCTIONAL DRAWINGS AND DESIGN CALCULATIONS : |
| D.1 | 132KV EQUIPMENT FOUNDATION DRAWINGS : |
| D.2 | 33KV EQUIPMENT FOUNDATION DETAILS : |
| 5 | Foundation design calculations for D.2.1 to 2.4 |