Test completed project
...
SCOPE OF WORK :
| Sl. No. | Drawing Title |
| 1 | Key SLD |
| 2 | Switchyard layout plan & elevation |
| 3 | Overall foundation layout |
| 4 | Structural GA drawings with design calculations for : |
| 5 | Overall structural layout |
| 6 | Foundation GA drawings with design calculations for : |
| 7 | 50MVA Transformer oil pit |
| 8 | Power & control cable schedule and interconnection diagram |
| 9 | Many visits to site for data collection, discussion with ABN and BSPTCL |