SCOPE OF WORK
| A. | ELECTRICAL DRAWINGS : |
| 1 | SLD |
| 1.1 | Key SLD |
| 1.2 | 132kV Line - Protection & Metering SLD |
| 1.3 | SLD - Bay Marshalling Kiosk - 132kV |
| 2 | ELECTRICAL LAYOUT & ELEVATION, EKD |
| 2.1 | 132kV Switchyard Layout - Plan & Elevation |
| 2.2 | 132kV Switchyard - Erection key diagram - Plan & Elevation |
| 3 | CABLE ROUTING, TRAY & TRENCH LAYOUT AND DETAILS |
| 3.1 | 132kV Switchyard - Cable Trench Layout and Sections with BOM of Cable Trays |
| 4 | EARTHING LAYOUT & DETAILS |
| 4.1 | 132kV Switchyard - Earthing Layout and BOM |
| 5 | CONTROL SCHEMATICS & BLOCK DIAGRAMS |
| 5.1 | 132kV Terminal Plan & Intelocking Logic Diagram at BMK |
| 6 | CABLE SCHEDULE & INTERCONNECTION DIAGRAMS |
| 6.1 | Control Cable Schedule and Interconnection Diagram |
| 6.2 | LV Power Cable Schedule and Interconnection Diagram |
| SUB TOTAL FOR ELECTRICAL | |
| C. | CIVIL DRAWINGS : |
| 1 | Foundation Details of all Support Structure : |
| 1.1 | 132kV LA |
| 1.2 | 132kV CT |
| 1.3 | 132kV Isolator |
| 1.4 | 132kV CB |
| 1.5 | 132kV Post Insulator (1 PH.) |
| 1.6 | 132kV Line Gantry Tower |
| 1.7 | 132kV A-frame structure |
| 1.8 | 132 KV CVT |
| 2 | Overall foundation layout with construction details of outdoor cable trench |
| D. | CIVIL DESIGN CALCULATIONS : |
| 1 | Design Calculation for Equipment Foundation |
| 2 | Design Calculation for Cable Trenches |
| SUB TOTAL FOR CIVIL | |
| E. | STRUCTURE DRAWINGS : |
| 1 | GA of Structures including BOM and Weight of each individual member for : |
| 1.1 | 132kV Isolator |
| 1.2 | 132kV CT |
| 1.3 | 132kV LA |
| 1.4 | 132KV CB |
| 1.5 | 132kV P.I - single phase |
| 1.6 | 132 KV CVT |
| 1.7 | 132kV Line Gantry Tower |
| 1.8 | 132kV Line Gantry Beam |
| 1.9 | 132kV A frame structure for Main Bus |
| 2 | 132kV A frame structure for Transfer Bus |
| F. | STRUCTURE DESIGN CALCULATION : |
| 1 | Design Calculation for Equipment support structures |