Test completed project
...
| Sl. No. | Scope of work (Preparation of following Drawings) |
| 1 | Key SLD of 220kV Line bay extension |
| 2 | Protection & Metering SLD of 220kV Line bay extension |
| 3 | SLD of 415V ACDB (extension) |
| 4 | SLD of 220V DCDB (extension) |
| 5 | SLD of 48V DCDB (extension) |
| 6 | SLD of 415V Normal LDB (extension) |
| 7 | SLD of 415V Emergency LDB (extension) |
| 8 | SLD of 415V BMK for 220kV bay |
| 9 | 220kV Switchyard and control room layout plan & elevation |
| 10 | 220kV Switchyard EKD plan & elevation |
| 11 | Layout plan & elevation of 220kV terminal tower and method of connection to 220kV substation gantry |
| 12 | Earthing layout plan and calculation of 220kV switchyard |
| 13 | DSLP layout plan and calculation of 220kV switchyard |
| 14 | Structural GA drawings with design calculations for : |
| 14.1 | Overall structural layout plan and elevation of 220kV switchyard |
| 14.2 | 220kV Bus gantry tower |
| 14.3 | 220kV Bus gantry beam |
| 14.4 | 220kV Line gantry tower |
| 14.5 | 220kV Line gantry beam |
| 14.6 | 220kV Shielding tower |
| 14.7 | 220kV Isolator with ES |
| 14.8 | 220kV Tandem Isolator |
| 14.9 | 220kV CT |
| 14.10 | 216kV LA |
| 14.11 | 220kV Post Insulator |
| 14.12 | 220kV CVT |
| 14.13 | 220kV Wave Trap |
| 14.14 | Structural design calculations |
| 15 | Foundation GA drawings with design calculations for : |
| 15.1 | Overall foundation layout of 220kV switchyard |
| 15.2 | 220kV Bus gantry tower |
| 15.3 | 220kV Line gantry tower |
| 15.4 | 220kV Shielding tower |
| 15.5 | 220kV Isolator with ES |
| 15.6 | 220kV Tandem Isolator |
| 15.7 | 220kV CB |
| 15.8 | 220kV CT |
| 15.9 | 216kV LA |
| 15.10 | 220kV Post Insulator |
| 15.11 | 220kV CVT |
| 15.12 | 220kV Wave Trap |
| 15.13 | BMK foundation |
| 15.14 | Design calculation for foundations |
|
|
|
| 16 | Power & control cable schedule and interconnection diagram |
| 17 | Site visit |
| 18 | Contour survey of the newly acquired area of the substation and terminal tower area |